Braemar House, Water Lane, Stansted, Essex CM24 8BJ 01279 810870 info@conneely.group

4 July 2024 Comments Off

Description: This construction involved a 15,000m² cladding system across 3 blocks, consisting of 540 apartments and large penthouses up to 10 storeys, along with a leisure centre, restaurants, and commercial units. Conneely Group

4 July 2024 Comments Off

Description: This project involved the construction of 1,093 student accommodation rooms, along with a sixth form college, office space, and a health suite, all within a 22-storey tower located at the mouth of

4 July 2024 Comments Off

Description: This project was a construction of a 30,000m² cladding system for 27 university student accommodation blocks, encompassing 2,511 bedrooms, a social hub building, and an energy centre. Conneely Group was contracted to

4 July 2024 Comments Off

Description: This project was a construction of 587 luxury residential apartments across 9 blocks, including a spa and a health and fitness suite. Conneely Group provided a full through-wall solution, installing SFS for

4 July 2024 Comments Off

Description: A significant mixed-use development located alongside the Wenlock Basin of Regent’s Canal, this project included 327 new homes across four blocks, ranging from seven to 10 storeys, with rooftop play areas and

4 July 2024 Comments Off

Description: This construction involved 326 apartments and townhouses across 3 blocks, forming part of a new residential development that includes cafes, restaurants, and a leisure centre. Internally, Conneely Group provided Gyvlon Flo screed,

4 July 2024 Comments Off

Description: The project was comprised of 639 apartments, maisonettes, and penthouses across 4 blocks, including a residents' clubhouse in a riverfront regeneration area. This project demanded the highest level of quality finish. Conneely

4 July 2024 Comments Off

Description: This project consisted of a construction of 352 luxury residential apartments and penthouses across 5 blocks, including a 25-storey tower in London’s newest dockside development. Conneely Group provided a full British Gypsum

4 July 2024 Comments Off

Description: This project was a construction of 482 apartments across 5 blocks, including 2 towers, each 30 storeys high. The project employed the ‘Jump Factory’ methodology, creating a factory-floor environment on a traditional

4 July 2024 Comments Off

Description: This project was a construction of 20,000m² of cladding systems across 9 blocks, comprising 426 mixed-tenure apartments and retail units, up to 14 storeys. Conneely Group delivered a challenging mixed façade of